WINONA — Temporary lane closures will be required next week on the Winona bridge across the Mississippi River as Minnesota Department of Transportation crews do an in-depth inspection.
The work will take a week, weather permitting, and will be done between 8 a.m. and 5 p.m. Both lanes will be open after work is done.
MnDOT does an annual inspection but a more detailed one every two years.